2 thoughts on “Is Nanyang’s construction site suspended in the winter of 2020?”
Ryan
Stop work! This winter will still be stopped. After a period of severe haze, the construction industry will be stopped, the motor vehicle limit number, and the severe time of the haze will be limited to the single and double number.
Generally, the construction site shutdown is based on the weather. If the weather is too cold and it is not conducive to construction, the construction site will be stopped.
Stop work! This winter will still be stopped. After a period of severe haze, the construction industry will be stopped, the motor vehicle limit number, and the severe time of the haze will be limited to the single and double number.
Generally, the construction site shutdown is based on the weather. If the weather is too cold and it is not conducive to construction, the construction site will be stopped.