1 thought on “I want to join the Dalian container driver WeChat group, who can pull me in, thank you!”

  1. 1. The team’s back boxes are packed in the factory to load the goods by the factory to the pier. 2. One day before the delivery, go to the box station for loading acceptance. 3. Pull the goods to the dock, and arrange a forklift box for the box station. 4. After the installation, after the shipping company’s lead seal, the box station plan will arrange containers to collect ports. 5. After collecting ports, wait for the big ship to come to Hong Kong …

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Scroll to Top